Industry:

MANUFACTURING

Project:

Car Policy Optimisation

Client:

Multinational operating in the escalators and elevators sector

SITUATION

  • Fleet size: 225
  • Vehicle type: Cars
  • Countries in scope: BE
  • Challenge: demonstrable savings and fleet management optimization (especially tyre cost)

SOLUTION

  • Contract change for tyre management
  • Assessment of the possibility to run fittings a second time

RESULTS

  • Measurable saving
  • Transparency